Line T2 Valle Brembana
From Bergamo to Villa d'Almè.
The new tram service will be integrated with public transport services in the urban area of Bergamo and the extra-urban networks of the Brembana Valley and the Imagna Valley. The project includes the provision of 2 additional stops connected to urban redevelopment interventions in the former Reggiani in Bergamo and the former Gres in Ponteranica - Sorisole.
Seven interchange parking lots will be built for a total of 513 parking spaces and 1 bike lane built by TEB, next to the tramway (San Fermo-Villa d'Almè) with a width of 2.5 m, 10 km long, connected to existing cycling networks and the strategic plan for cycling mobility. The cycle path will allow alternative access to stops and a connection with urban centers crossed by the tram line.
The Ranica Operational Control Center remains the operational core of both tram lines, optimizing management and costs. Along Line T2, a new Depot will be built near the Petosino stop for the storage, washing, and cleaning of 10 trams.
The technical-economic feasibility project for Line T2, developed by TEB in December 2018, in collaboration with the Municipality of Bergamo and accompanied by agreements signed with the Region, the Province, and the municipalities involved in the route, was positively evaluated and funded in 2019 by the Ministry of Infrastructure and Transport. Specifically, the total investment is 225,013,000 euros, financed by the Ministry of Infrastructure and Transport, the Lombardy Region, the Municipality and Province of Bergamo, and other municipalities involved in the route with the support of the BIM Consortium.
The transport analysis and economic evaluation of the project show positive results that were evaluated by the Ministry with a benefit/cost ratio of 1.86.
From design to execution, the stars of the T2 line.
The final project was drafted by the temporary group of designers called "RTI Tramsì" – established by ITALFERR as lead company and, as principals, E.T.S., S.D.A. PROGETTI and Ing. Arini. Architect Paolo Belloni, commissioned by TEB, also provided design consultancy for the architectural and landscape quality of the structures, the depot, and the stops at Bronzetti and Ponteranica.
Following a public tender, the works for the construction of the project were entrusted to the temporary consortium of companies (RTI) formed by Impresa Milesi geom. Sergio, G.C.F. Generale Costruzioni Ferroviarie, Skoda Transportation, and Impresa Edile Stradale Artifoni. The consortium of companies is responsible for the executive design, safety coordination during the executive design phase, execution of the works, supply, and equipping of tram vehicles.
The executive project was prepared by RTP composed of Systra-Sotecni S.p.A. (lead company), SWS Engineering S.p.A. (principal), and Architecna Engineering S.r.l. (principal) with the participation of: eng. Francesco Nozza, eng. Stefano Rossi, eng. Giuseppe Pasinetti, eng. Agostino Maninetti, architect. Ivanoe Mauro Rapanà, geol. Mattia Benzi, eng. Davide Grablovitz.